Public Works

Construction Moratorium

Road Closure/Construction Moratorium for the Holiday Season

The holiday season is just around the corner, and the City of Elk Grove will institute a construction moratorium on selected City streets from November 20, 2011 through January 2, 2012. Construction activities and house moving occurring between the hours of 8:00 AM and 10:00 PM that interfere with public traffic on specific City streets will be restricted to emergency repairs as set forth in Section 7-8.06 of the Standard Construction Specifications.  Enclosed is a table and map depicting the designated streets for the moratorium.  Construction activities and house moving pertaining to these specific streets shall be completed prior to the moratorium or be postponed.

The City appreciates your cooperation and hopes this reminder will help to minimize scheduling conflicts.  If you have construction scheduling difficulties or questions, please contact Kerrie Stevens at (916) 687-3013.

Road Closure Moratorium for the Holiday Season-  Streets
November 20, 2011 through January 2, 2012

Requires pdf reader.View Map

Moratorium Streets Roadway Segments (Both Directions)
Calvine Road (East Direction Only) Highway 99 to Elk Grove-Florin Road
Laguna Boulevard Franklin Boulevard to Highway 99
Bond Road Highway 99 to UPRR Tracks
Elk Grove Boulevard Backer Ranch Road to Waterman Road
Bruceville Road Sheldon Road to Backer Ranch Road (west) and Civic Center Drive (east)
Big Horn Boulevard Bruceville Road to Laguna Boulevard
West Stockton Boulevard Dunisch Road to Elk Grove Boulevard
East Stockton Boulevard Whitehouse Creek to Valley Oak Lane
Elk Grove-Florin Road Calvine Road to Valley Oak Lane
Grant Line Road Mooney Road to Bond Road
Wilton Road Grant Line Road to City Boundary
Franklin Boulevard Corner of Franklin Boulevard (east)and Elk Grove Boulevard (south)