- Public Works Department Homepage
- Capital Improvements
- Private Development
- Building, Safety & Inspection
- Water Resources
- Flood Control
- Street Maintenance
- Traffic Engineering
- Improvement Standards
- Standard Construction Specifications
- Standard Drawings
- Modifications or Additions to Improvement Standard and Details (10/10/07)
- Rural Road Improvement Policy & Standards
- GIS
- Neighborhood Livability Program
- Road Closure/Work Notifications
- Connector Joint Powers Authority
- Sacramento Area Council of Governments (SACOG)
- How Beavers Impact Storm Drainage - Flood Control Facilities - Fact Sheet
- Public Works Customer Service Survey
- Contact Us
City of Elk Grove
8401 Laguna Palms Way
Elk Grove, California 95758
(916) 683-7111
(916) 691-2001 Fax
24 hour Emergency
Phone Number:
(916) 687-3005
Public Works
Private Development: Frequently Asked Questions
What are the submittal requirements and improvement standards for civil plans?
For submittal requirements and improvement standards click links below:
Improvement Plans - Submittal Requirements to Public Works
Submittal Requirements to Public Works
Landscape Plans- Submittal Requirements to Public Works
Submittal Requirements to Public Works
| Note: | The Improvement Standards adopted October 10, 2007, shall apply to all development applications not deemed complete on the date of adoption and the Construction Specifications shall apply to all projects that have not received improvement plan review comments on the date of adoption. |
Improvement Standards (October 10, 2007)
Construction Specifications (October 10, 2007)
Standard Drawings (October 10, 2007)
Modifications or Addition to Improvement Standard and Details (October 10, 2007):
- Modification Number 20071231-1: Modification to T19.
- Modification Number 20071231-2: Modification to L28 and L29.
- Modification Number 20071231-3: Modification to ST-14A, St 14B, ST-15A, and ST-15B.
- Modification Number SL30 & 31 Rev 2: Revisions 2 to standard drawings number SL30 and SL31.
- Modification Number Section 49-6.03 Internally Illuminated Street Name Signs Rev. 1: Revisions of Section 49-6.03 of the Standard Construction Specifications in its entirety and Revisions of Standard Drawing Number T-13
Previous Improvement Standards:
Prior Improvement Standards
(City of Elk Grove adopted the County of Sacramento Improvement Standard, June 1, 1999)
Prior Standard Construction Specifications
(City of Elk Grove adopted the County of Sacramento Standard Construction Specifications, September 2001)
Modifications of or Addition to Improvement Standards and Details for Improvement Standards dated June 1, 1999 and Standard Construction Specifications (September 2001):
- Modification Number 032206-1 Developer’s Responsibility
- Modification Number 090905-1 Street Lights - Zone 2, ST-11 through ST-19 and Street Lights both Zone 1 and 2, ST-20 through ST-27
- Modification Number 062405-1 On-Site Stormwater Quality Measures
- Section 11 - Stormwater Quality Protection, Erosion and Sediment Control and Permanent Stormwater Quality Control Measures
- Modification Number 051305-2 Pre-Formed Rubberized Speed Cushion Layout and Typical Signing and Striping T-2
- Modification Number 082806-1 Delete Section 9-12.A.iv of the Improvement Standards
- Modification Number 072505-1 Roadway and Trench Backfill Standards
- Modification Number 082506-1 Roadway and Trench Backfill Standard
- Modification Number 051305-1 Typical Trench Compaction Detail ST-8
- Trench Backfill and Resurfacing Standard ST-1 through ST-7 and ST-9 and ST-10
- Street Survey Monument
Special Provisions for Legal Relations and Responsibilities
Standard Notes
- City of Elk Grove General Notes
- City of Elk Grove Drainage Notes
- City of Elk Grove Supplemental Notes
- City of Elk Grove Erosion & Sediment Control Notes
- City of Elk Grove Signing & Striping Notes
- National Pollution Discharge Elimination System Notes
Project Billing Information Form
Utility Representative Contact List
What should I do if I want to abandon a local street, alley or easement?
Abandonments
Submittal Requirements to Public Works
Project Billing Information Form
What should I do if I want to move a property boundary line?
Boundary Line Adjustments
Submittal Requirements to Public Works
What should I do if I want to dedicate an easement for public right of way, utilities, drainage, etc.?
Easements by Separate Documents
Submittal Requirements to Public Works
Project Billing Information Form
What is the difference between a Parcel Map and Final Map? What are the submittal requirements?
Parcel Maps and Final Maps
Submittal Requirements to Public Works
Project Billing Information Form
What are Public Works submittal requirements for Production Homes?
Production Homes
Submittal Requirements to Public Works
Model Home Building Permits
Public Works
Production Home Building Permits
Public Works
Final Building Permit Inspection/Occupancy
Public Works
What are the Public Works submittal requirements for a Residential Permit?
Accessory Building
Habitable (120 square feet or more)
Submittal Requirements to Public Works
Accessory Building
Non-Habitable (120 square feet or more)
Submittal Requirements to Public Works
Manufactured Home
Submittal Requirements to Public Works
New Addition
Residential Building
Submittal Requirements to Public Works
Single Family
Residential Building
Submittal Requirements to Public Works
What permit do I need to do construction in the public right of way?
Encroachment Permits
Traffic Control Plan
Trench Cut Fees
What if I need a new address for a building?
Addressing Application
Commercial and Non-Subdivision
Click here to download reader.
